CASE4
Former two-part assembly consolidated to produce one simplified, quality part
Quality Improvement
BEFORE
This part was originally designed as a welded two-part assembly, which led to lead-time and durability problems.
User Needs
I want to improve the part's accuracy !
VAE PROPOSAL
Create a single cold formed part, and integrate the entire production process to be in-house.
① Chamfering
② Flattening
③ Trimming
④ Bending
AFTER
Endurance :
5x stronger part
Lead-time :